Home Company Info Product List Contact Details
Homeproduct Directory

ZSFU membrane-type role of the pre-installation

ZSFU membrane-type role of the pre-installation
company Ruian Changcheng Fire-fighting Equipment CO.,LTD
Update2011-03-31
Original RegionChina
ZSFU membrane-type role of the pre-installation
1 shows
Divide the role of pre-installed in recent years developed the sprinkler installation, it is to fire automatic alarm detection technology and sprinkler systems to combine the role of the pre-installed on the protection of objects from the dual role of protection, in particular, apply to Freezing cold and usually avoid below, does not allow the emergence of jet mistakenly important place, such as computer room, generator room, library, historical archives, such as overhead storage sites. Not in case of fire, the system side of the pipeline filled with compressed air, so that the system has the characteristics of dry-type system that can meet the severe cold and high temperature conditions sprinkler.
Diaphragm valves and the rain is the role of pre-control system for water flow and play the role of the police unit, that is, in the event of fire control system to make it divide opened to allow water into the pipeline system, the system change in the wet-dry sprinkler , Report to the police. Valves on the lack of room (the control cavity) within the high and low water pressure in control of the diaphragm to open or close. When the cavity control the water pressure equivalent to the water supply pressure, the diaphragm shut down, water can not enter the system side; when control of cavity pressure than the pressure of water supply is low, then divide by open-top water pressure, water flows into the side of the system, Sprinkler.
Divide room (the control cavity), the pressure mounted on the protection of the region by the detection system to control, the detection system at the same time that the rain-diaphragm valve drive system, the system is divided into electrical control, pneumatic or hydraulic control Control. (See chart form devices, fire-fighting equipment system schematic)
2, Model specifications
Model Nominal
Path
(mm) rated workers
For pressure
(MPa) rated a high degree of body axis
To the extreme left
(L1) body axis
To the right
(L2) body axis
To back-end
(L3) body axis
To front-end
(L4) flange bolts
Hole diameter
(H1) (H2)
ZSFU-100 100 1.2
1.6 568 810 290 505 300 300 8x18
ZSFU-150 150 1.2
1.6 690 925 310 525 300 340 8x22
ZSFU-200 200 1.2
1.6 930 1170 380 530 300 430 12x22
3, and the performance of the main technical parameters
Rated pressure: 1.2 ~ 1.6MPa body strength test pressure: 4.8 ~ 6.4MPa valve Test seals pressure: 2.4MPa, 3.2MPa low pressure switch on the set: 0.01MPa air in the maintenance of electrical installations Set in the contact pressure gauge: 0.03 ~ 0.05MPa
Products based on standards: "Q/RCC-103-2004 sprinkler system, the role of pre-installed"
4. Divide the role of pre-installed fire-fighting systems schematic (a)
1. Spray fire pumps 11. Pressure switch
2. Pump regulator 12. Hydraulic alarm
3. Combination of pump-13. Alarm pipe passing through the filter
4. Regulator tank 14. Alarm ball control
5. Butterfly water supply signal 15. Alarm test ball
6. Valves 16. Serbian police pipeline water
7. Alarm valve (one-way valve) 17. Passers-controlled pipe filter
8. Signals from the water 18 butterfly. Pipeline control (one-way valve)
9. Inflatable isolation valve 19. Cavity to control water ball
10. Air pressure gauge 20. Pipeline control restrictor 21. Following the anti-reset actuators 31. Air
22. Inlet pressure gauge 32. Filling the role of pre-Dian Konggui
23. Solenoid valve 33. Flow indicator
24. Emergency locking ball 34. Closed nozzles to spray water
25. Cavity to control pressure gauge 35. Electromagnetic exhaust valve block
26. 36 water valve. End water-test equipment
27. Isolation water ball 37. High water tank
28. Water ball 38. Wen sense of Smoke Detectors
29. Maintenance of the air by-pass device ball 39. Fire Control Center
30. Maintenance of the air device
5, the role of pre-installed device debugging steps
5.1. Installation should have the conditions
5.1.1 Manifolds should have been installed, Ferrules 1.2 meters high from the ground; left around the room.
5.1.2 pipeline has been running water, the water pressure after a strength test.
5.1.3 solenoid valves, pressure switches, signal butterfly valve, filling the role of pre-Diankong Gui, electromagnetic exhaust valve block and control center complete the connection.
5.1.4 pre-filling the role of Dian Konggui and maintenance of air pressure gauge device in electric contact, low pressure switch controllers, air compressor, the completion of the power supply wiring.
5.1.5 device in the maintenance of air power to set the contact pressure gauge 0.03 ~ 0.05MPa, low pressure switch settings on the controller 0 .01 MPa.
5.1.6 the valve block has water, electricity, the device Ferrules group for a minimum pressure 0.3MPa.
5.2. Debugging

ZSFU membrane-type role of the pre-installation on sale

Products Showcase

See more products from this supplier.

Do you want to show products of your own company? Join FREE now!

You may also be interested in: